Home > Terms > English, UK (UE) > Construction recapture
Construction recapture
The maximum number of years that could be added to a facility's licence expiration date to recapture the period between the date the NRC issued the facility's construction permit to the date it granted an operating license. A licensee must submit an application to request this extension. For further information, see the Staff Requirements Memorandum regarding SECY-98-296, "Agency Policy Regarding Licensee Recapture of Low-Power Testing or Shutdown Time for Nuclear Power Plants. "
This is auto-generated content. You can help to improve it.
0
0
Improve it
- Part of Speech: noun
- Synonym(s):
- Blossary:
- Industry/Domain: Energy
- Category: Nuclear energy
- Company: U.S. NRC
- Product:
- Acronym-Abbreviation:
Other Languages:
Member comments
Terms in the News
Featured Terms
Industry/Domain: Biology Category: Marine biology
Dracula fish
A new species of fish discovered in the Mekong River region in 2009. The Dracula fish is so named because it has two fangs at the front of its top ...
Contributor
Featured blossaries
Chloé Bernard
0
Terms
2
Blossaries
0
Followers
GE Smart Series Cameras
Category: Technology 1 1 Terms
Browers Terms By Category
- Industrial automation(1051)
Automation(1051) Terms
- Satellites(455)
- Space flight(332)
- Control systems(178)
- Space shuttle(72)
Aerospace(1037) Terms
- General architecture(562)
- Bridges(147)
- Castles(114)
- Landscape design(94)
- Architecture contemporaine(73)
- Skyscrapers(32)
Architecture(1050) Terms
- Cosmetics(80)
Cosmetics & skin care(80) Terms
- General boating(783)
- Sailboat(137)
- Yacht(26)