метода критичног пута (МКП)

A schedule network analysis technique used to determine the amount of scheduling flexibility (the least amount of float) on various logical network paths in the project schedule network, and to determine the minimum total project duration. Early start and finish date are calculated by means of a forward pass using a specified start date. Late start and finish dates are calculated by means of a backward pass, starting from a specified completion date, which sometimes is the project early finish date determined during the forward pass calculation.

0
Collect to Blossary

Member comments

You have to log in to post to discussions.

Terms in the News

Featured Terms

Dragan Zivanovic
  • 0

    Terms

  • 0

    Blossaries

  • 10

    Followers

Industry/Domain: Festivals Category: Christmas

свећа

A light source typified by a wick embedded in solid fuel, usually fax or fat, and used in Christianity to symbolize the Light of Jesus Christ.

Contributor

Featured blossaries

Classroom teaching

Category: Education   3 24 Terms

The World News

Category: Other   2 30 Terms

Browers Terms By Category