Home > Terms > English, UK (UE) > Bottom-up estimating
Bottom-up estimating
A method of estimating a component of work. The work is decomposed into more detail. An estimate is prepared of what is needed to meet the requirements of each of the lower, more detailed pieces of work, and these estimates are then aggregated into a total quantity for the component of work. The accuracy of bottom-up estimating is driven by the size and complexity of the work identified at the lower levels. Generally smaller work scopes increase the accuracy of the estimates.
This is auto-generated content. You can help to improve it.
0
0
Improve it
- Part of Speech: noun
- Synonym(s):
- Blossary:
- Industry/Domain: Business services
- Category: Project management
- Company: WSDOT
- Product:
- Acronym-Abbreviation:
Other Languages:
Member comments
Terms in the News
Featured Terms
Industry/Domain: Economy Category: International trade
Free Trade Area of the Asia-Pacific (FTAAP)
The Free Trade Area of the Asia-Pacific (FTAAP) is an international trade pact backed by China and supported by the 21-member Asia-Pacific Economic ...
Contributor
Featured blossaries
Browers Terms By Category
- Film titles(41)
- Film studies(26)
- Filmmaking(17)
- Film types(13)
Cinema(97) Terms
- Chocolate(453)
- Hard candy(22)
- Gum(14)
- Gummies(9)
- Lollies(8)
- Caramels(6)
Candy & confectionary(525) Terms
- Railroad(457)
- Train parts(12)
- Trains(2)
Railways(471) Terms
- Ceramics(605)
- Fine art(254)
- Sculpture(239)
- Modern art(176)
- Oil painting(114)
- Beadwork(40)
Arts & crafts(1468) Terms
- Economics(2399)
- International economics(1257)
- International trade(355)
- Forex(77)
- Ecommerce(21)
- Economic standardization(2)