
Home > Terms > English, UK (UE) > Critical- path method
Critical- path method
A method of selecting, from among a number of possible schedules for a project, that schedule which best satisfies certain desiderata such as efficiency, time for completion, etc. It involves separating the project into sub projects or steps and identifying those steps (the critical steps) whose place or timing in the sequence cannot be changed, and adjusting the rest of the schedule to accommodate these critical steps as well as possible.
This is auto-generated content. You can help to improve it.
0
0
Improve it
- Part of Speech: noun
- Synonym(s):
- Blossary:
- Industry/Domain: Earth science
- Category: Mapping science
- Company: American Congress on Surveying & Mapping
- Product:
- Acronym-Abbreviation:
Other Languages:
Member comments
Terms in the News
Featured Terms
Indian Premier League (IPL)
Indian Twenty20 cricket league, in which 10 Indian teams compete to be No.1. The league, first organised in 2008, is the second-highest paying of all ...
Contributor
Featured blossaries
Browers Terms By Category
- General architecture(562)
- Bridges(147)
- Castles(114)
- Landscape design(94)
- Architecture contemporaine(73)
- Skyscrapers(32)
Architecture(1050) Terms
- Pesticides(2181)
- Organic fertilizers(10)
- Potassium fertilizers(8)
- Herbicides(5)
- Fungicides(1)
- Insecticides(1)
Agricultural chemicals(2207) Terms
- Satellites(455)
- Space flight(332)
- Control systems(178)
- Space shuttle(72)
Aerospace(1037) Terms
- Clock(712)
- Calendar(26)