Home > Terms > English, UK (UE) > Material requirements planning (MRP)

Material requirements planning (MRP)

The process that uses the MPS as demand, explodes the bill of material for specified MPS items, nets those requirements against on-hand inventory and existing open orders, and recommends placing new production and purchase orders and changes to existing orders based on parameters that consider safety stock levels, lot sizes and lead times. It is based on the idea of dependent demand (demand for an item is due to its usage in other items) and starts at the highest level in the bill of material, stopping at the first level where the quantity of inventory plus incoming receipts is adequate to meet demand and it is not necessary to send a requirement to the next lower level. While sometimes considered complex due to many levels in the bill of material or a large number of items, MRP in general is just a calculator and depends completely on the accuracy of the MPS, bills of material and order date and quantity information to be useful.

This is auto-generated content. You can help to improve it.
0
  • Part of Speech: noun
  • Synonym(s):
  • Blossary:
  • Industry/Domain: Software
  • Category: Supply chain
  • Company:
  • Product:
  • Acronym-Abbreviation:
Collect to Blossary

Member comments

You have to log in to post to discussions.

Terms in the News

Featured Terms

Harry8L
  • 0

    Terms

  • 0

    Blossaries

  • 1

    Followers

Industry/Domain: Health care Category: Diseases

Steroid meningitis

Steroid meningitis is an inflammation of the protective membranes covering the brain and spinal cord, known collectively as the meninges. The ...

Contributor

Featured blossaries

longest English words

Category: Other   1 6 Terms

Dark Princess - Without You

Category: Entertainment   2 10 Terms