Resource-limited schedule
A project schedule whose schedule activity, scheduled start dates and scheduled finish dates reflect expected resource availability. A resource-limited schedule does not have any early or late start or finish dates. The resource-limited schedule total float is determined by calculating the difference between the critical path method late finish date and the resource-limited scheduled finish date. Sometimes called resource constrained schedule. See also resource leveling.
This is auto-generated content. You can help to improve it.
0
0
Improve it
- Part of Speech: noun
- Synonym(s):
- Blossary:
- Industry/Domain: Business services
- Category: Project management
- Company: WSDOT
- Product:
- Acronym-Abbreviation:
Other Languages:
Member comments
Terms in the News
Featured Terms
Industry/Domain: Beverages Category: Bottled water
Evian
Evian is a high-end brand of bottled mineral water produced with water sources near Évian-les-Bains in the French Alps. Owned by the French ...
Contributor
Featured blossaries
stanley soerianto
0
Terms
107
Blossaries
6
Followers
Blossary Of Polo Shirts Brands
Category: Fashion 1 10 Terms
Browers Terms By Category
- Printers(127)
- Fax machines(71)
- Copiers(48)
- Office supplies(22)
- Scanners(9)
- Projectors(3)
Office equipment(281) Terms
- Prevention & protection(6450)
- Fire fighting(286)
Fire safety(6736) Terms
- Industrial lubricants(657)
- Cranes(413)
- Laser equipment(243)
- Conveyors(185)
- Lathe(62)
- Welding equipment(52)
Industrial machinery(1734) Terms
- Cosmetics(80)