Metoda ključne putanje (CPM)
A schedule network analysis technique used to determine the amount of scheduling flexibility (the least amount of float) on various logical network paths in the project schedule network, and to determine the minimum total project duration. Early start and finish date are calculated by means of a forward pass using a specified start date. Late start and finish dates are calculated by means of a backward pass, starting from a specified completion date, which sometimes is the project early finish date determined during the forward pass calculation.
0
0
Improve it
- Part of Speech: noun
- Synonym(s):
- Blossary:
- Industry/Domain: Business services
- Category: Project management
- Company: WSDOT
- Product:
- Acronym-Abbreviation:
Other Languages:
Member comments
Terms in the News
Featured Terms
Industry/Domain: Holiday Category: Religious holidays
Hanuka
Also spelled Chanukah, Hanukkah is a Jewish holiday that lasts for eight days, celebrated as a re-dedication of the Holy Temple in Jerusalem. A ...
Contributor
Featured blossaries
Marouane937
0
Terms
58
Blossaries
3
Followers
The World's Nine Most Powerful Women
Category: Politics 1 9 Terms
Browers Terms By Category
- Wine bottles(1)
- Soft drink bottles(1)
- Beer bottles(1)
Glass packaging(3) Terms
- Ballroom(285)
- Belly dance(108)
- Cheerleading(101)
- Choreography(79)
- Historical dance(53)
- African-American(50)
Dance(760) Terms
- General astrology(655)
- Zodiac(168)
- Natal astrology(27)
Astrology(850) Terms
- Health insurance(1657)
- Medicare & Medicaid(969)
- Life insurance(359)
- General insurance(50)
- Commercial insurance(4)
- Travel insurance(1)
Insurance(3040) Terms
- Air conditioners(327)
- Water heaters(114)
- Washing machines & dryers(69)
- Vacuum cleaners(64)
- Coffee makers(41)
- Cooking appliances(5)