Home > Terms > English, UK (UE) > Ratio schedules of reinforcement

Ratio schedules of reinforcement

A schedule in which reinforcement is delivered contingent on the last of a number of responses. (a) Fixed ratio (FR) schedule-A reinforcement schedule in which a constant number of responses must occur prior to the reinforced response. For example, an FR 3 schedule indicates that each third response is reinforced. (b) Variable ratio (VR) schedule A schedule in which a variable number of responses must occur prior to the reinforced response. The number of responses usually varies around a specified average. For example, a VR 6 means that an average of one of six performances is reinforced.

This is auto-generated content. You can help to improve it.
0
Collect to Blossary

Member comments

You have to log in to post to discussions.

Terms in the News

Featured Terms

Sysop02
  • 0

    Terms

  • 0

    Blossaries

  • 1

    Followers

Industry/Domain: Automotive Category: Tires

Air Free

Air Free is a second-generation prototype of Bridgestone's airless tires that are designed to replace conventional air inflated tires. Air ...

Contributor

Featured blossaries

People of Renaissance

Category: Arts   1 19 Terms

Robin Williams Famous Movies

Category: Entertainment   2 6 Terms